BEI Logo
Entertainment :: Detroit Zoo: Dinosauria
Dinosauria under Construction

Detroit Zoological Institute

Dinosauria Simex Simulator

                       

 

Royal Oak, Michigan

Detroit Zoo: Dinosauria photos
x
Dinosauria under Construction Two
Dinosauria under Construction Two
x
x
x
SERVICES
Engineering
CONSTRUCTION COST:
$1.75 million
START/COMPLETE
2001

BEI provided engineering services, for the Detroit Zoological Institute for Dinosauria III, a 30-seat, electric simulator adventure and story theater.

 

BEI's responsibilities included structural design and engineering for the massive concrete base that supports the simulator, the building foundation and structural steel frame to support the foam outer shell.  BEI also provided electrical and mechanical engineering services.

 

BEI worked with Simex/Moog, of Toronto, Ontario and the Detroit Zoological Institute to certify simulator ride and aide the client to secure a ride permit from the state of Michigan Amusement Ride Inspection Department.

Bullet Aviation & Transportation
Bullet College & University
Bullet K-12 Schools
Bullet Entertainment
Bullet Office Buildings
Bullet Health Care
Bullet Correctional
Bullet Parking Structures
Bullet Laboratory and R&D
Bullet Automotive
Bullet Pharmaceuticals
Bullet Light Industrial
Bullet Design / Build
Bullet Waste to Energy
Bullet Co-Generation
Bullet Utilities
Bullet Medical Waste Management
Bullet Process
Bullet Parks & Recreation
Bullet Land Development
Bullet Water / Wastewater
Bullet Roadway
Copyright 2009 - BEI Associates, Inc.